
National Health Service
Case Study Refurbishment of NHS building in Merseyside Client: Knowsley Primary Care Trust Details of Work: Carry out initial inspection of the site Carry out
BLOG
Case Study Refurbishment of NHS building in Merseyside Client: Knowsley Primary Care Trust Details of Work: Carry out initial inspection of the site Carry out
Case Study Refurbishment Survey & Soft Strip for Data Centre Client: The Royal Bank of Scotland Details of Work: Carry out an initial asbestos refurbishment
Case Study The Royal Liver Building Asbestos Inspection Client: JJ Marr Ltd Details of Work: Carry out an initial asbestos survey of the building Produce
Case Study The CIS Tower Manchester City Centre Client: The Co-operative Group Details of Work: Survey & Repair Carry out a locailsed refurbishment survey on
Case Study The Safe School Programme 2005-2013 Client: Elton Primary School, Cheshire Details of Work: Carry out a survey of the boiler room to locate
Case Study The Safe School Programme 2005-2013 Client: Denbighshire County Council Details of Work: Carry out an initial asbestos survey of the buildings Produce &